George Massey Tunnel Replacement Project

George Massey Tunnel Replacement Project: Navigation Assessment

TyPlan prepared a navigational assessment of the proposed new George Massey Bridge to replace the existing George Massey Tunnel. The study scope included a review of the Port Metro Vancouver's new  land use plan, assessment of the navigability of the deep sea channel(s) to accommodate existing and future vessels potentially utilizing the Fraser river.

Detailed assessment of the world wide fleet vessel characteristics associated with Liquefied natural gas, container and bulk carriers was utilized to determine the percentage of the world wide fleet by vessel type that could navigate under the bridge at varying vertical clearances, and the percentage of the world wide fleet that could navigate at various water drafts considering the removal of the existing cover rock at the tunnel. Navigational clearances were subsequently recommended based on the finding.



Go Back

Community Involvement
Typlan giving back to the community

Typlan supports Heart & Stroke’s mission to Promote Health, Save Lives and Enhance Recovery from heart disease and stroke.

Professional associations we are involved with:

Get in touch with us

If you have a question about our company, our services or recent projects, please contact us. We'd love to hear from you!

Contact Us

Site Settings Management

TyPlan is a planning and management firm that provides clients unique solutions to land use and resource management issues.

More Info

Email: info/at/typlan.ca

Phone: 604.461.6664